Details
Location: | Oshawa, ON |
Client | City of Oshawa |
Consultant | AMTEC Engineering |
Year | 2021 |
Scope:
The walking path at Adelaide trail had been slowly deteriorating making it hazardous to walk as water levels would make slippery conditions for pedestrians. Part of the restoration of this path included; retaining wall reconstruction, using tie-back anchors to rehab the southwest retaining wall, culvert header reconstruction, and channel rehabilitation, concrete overlay within the pedestrian culvert.