Altona Bridge Replacement

Details

Location: Pickering ON
Client City of Pickering
Consultant Greer Galloway Group
Year 2020

 

Scope:

The scope of work for this job included the removal and replacement of the Altona Bridge structure spanning Duffins Creek. Our crew was on site to excavate and dispose of all earth and material needed to make way for the new pre-cast concrete box culvert that was to be placed. The work included, but was not limited to, the excavation, grading and consolidating of the excavated areas for the structure, roadways, boulevards, driveways, sidewalks, curb and gutter which included brining all original grading back to its original condition. After excavation our crew formed and poured a key-way where our pre-cast culvert would later be placed.